Update of Liden Centre Refurbishment

Highway signs to be located on Liden drive at both the Grundy’s and Barrington close.
The signs will read ‘Village Centre’

The designs of the signs themselves have been completed

Timeline for the manufacture and installation to follow shortly

Fencing – Delivery of the fencing/materials is anticipated in early December. Installations timeline to follow once the manufacture has confirmed a delivery date

The remaining work will go out to tender in December